Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
2368 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
1181
ABRT
Ran out of ADM TSC resources.
1. Execute test tsc-administered at 1-minute intervals up to 3 
times.
1182
ABRT
The BX.25 link is down at the gateway.
1. Disable the ADM TSC.
2. Check the status of the gateway link using status link lnk#.
3. Once the gateway link indicates an in-service state, enable the 
Administered TSC.
4. Execute test tsc-administered.
2000
ABRT
The Administered TSC is not responding to a TSC heartbeat inquiry.
1. Retry test tsc-administered at 1-minute intervals up to 3 times.
2. If the problem continues to fail, obtain the status of the D channel or 
D-channel pair associated with the ADM TSC using status 
signaling-group grp#
. If the D channel is INS (i.e., in-service) and 
the status of the ADM TSC appears to be active, then disable and 
enable the ADM TSC through administration.
NOTE: To disable the ADM TSC, display the Signaling Group 
administration screen using change signaling-group grp# where 
group refers to the number of the signaling group under which the 
suspect TSC is administered. Set the Enable field to n. To enable the 
ADM TSC, set the Enable field to y.
3. Execute test tsc-administered.
4. If the test fails, check the ADM TSC node on the other side of the 
network to verify that the ADM TSC is indeed active.
2012
ABRT
Internal system error.
1. Execute test tsc-administered at 1-minute intervals up to 5 
times.
Table 848: Test #604 TSC Heartbeat Inquiry Test  (continued)
Error
Code
Test
Result
Description / Recommendation
 3 of 4