Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
2506 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Test failure indicates failure of one or more of the following components:
VAL (TN2501) circuit pack
TDM bus
Tone generator / tone receiver circuit pack
Table 888: Test #1285 TDM Loop-Around Test 
Error
Code
Test
Result
Description / Recommendation
1000
ABRT
The port is in use.
1. Retry the command when the port is idle. You can force the port to the 
idle state with busyout port location.
2. Escalate if the problem persists.
Note: This command is destructive, tearing down every call and link using 
the port.
1002
ABRT
No TDM bus timeslots available for the test.
1. Retry the command at 1-minute intervals up to 5 times.
2. Escalate if the problem persists.
1003
ABRT
No more tone receivers idle for use in this test.
1. Retry the command at 1-minute intervals up to 5 times.
2. Escalate if the problem persists.
G700
:
1412
ABRT
On the G700, this test aborts with Error Code 1412.
2000
ABRT
Did not receive circuit pack test response within the allowable time period.
1. If this problem persists, reset the circuit pack (busyout board 
locationreset board location, and release board 
location
).
2. Repeat the test.
3. If the problem persists, replace the circuit pack.
2012
ABRT
Internal system error.
1. Retry the command at 1-minute intervals up to 3 times.
2. Escalate if the problem persists.
2100
ABRT
Could not allocate the necessary system resources to run test.
1. Retry the command at 1-minute intervals up to 5 times.
2. Escalate if the problem persists.
 1 of 2