Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
2548 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
NPE Audit Test (#50)
Note:
Note:
G700
: On the G700/G350, this test aborts with Error Code 1412.
The system sends a message to the on-board microprocessor to update the network 
connectivity translation for every NPE (Network Processing Element) on the circuit pack.
Table 909: Test #50 NPE Audit Test 
Error
Code
Test
Result
Description / Recommendation
None 
2100
ABRT
System resources required for this test are not available.
1019
ABRT
Test already in progress.
G700
:
1412
ABRT
This test does not execute on a G700 Media Gateway.
FAIL
Internal system error
1. Retry the command at 1-minute intervals up to 5 times.
PASS
The circuit pack’s NPEs have been updated with their translation.
EXTRA 
BD
Certain circuit packs have limitations on how many circuit packs can be in 
the system or port network such as the Maintenance/Test circuit pack 
(TN771B or TN771C), the Tone Detector circuit pack (TN748B, TN748C or 
TN748D) and the Call Classifier (TN744). The Maintenance/Test circuit 
pack allows only one circuit pack per port network. The Tone Detector and 
Call Classifier allow only 10 circuit packs in each system. All additional 
circuit packs will return EXTRA-BD and should be removed.
Any
NO 
BOARD
This is normal if the test is being done when: (a) the board is not 
physically in the system or (b) the system is booting up. Otherwise, there 
is some inconsistency between the physical configuration and the data 
kept in the system.
1. Verify that the board is physically in the system.
2. Verify that the system is not in a stage of booting up.
3. Retry the command at 1-minute intervals up to 5 times.