Avaya 03-300430 User Manual

Page of 2574
AN-LN-PT (Analog Line Port)
Issue 1 June 2005
429
 
System technician-demanded tests: descriptions and error codes
Investigate tests in the order presented.  By clearing error codes associated with the Battery 
Feed test (#35), you may clear errors generated from other tests in the sequence.
NPE Crosstalk Test (#6)
S8300
 / 
G700
: T
his test aborts with Error Code 1412.
This test verifies that the port’s NPE channel talks on the selected time slot and never crosses 
over to time slots reserved for other connections.  If the NPE is not working correctly, one-way 
and noisy connections may be observed.  This test is usually part of the long test sequence and 
executes in about 20 to 30 seconds.
Order of Investigation
Short 
Test 
Sequence
Long Test 
Sequence
D/
ND
1
1. D = Destructive; ND = Nondestructive
Battery Feed test (#35)
X
X
ND
Station Present test (#48)
X
X
ND
Analog Looparound test (#161)
S8300
 / 
G700
: This test aborts with Error Code 1412.
X
ND
Conference test (#7)
S8300
 / 
G700
: This test aborts with Error Code 1412.
X
ND
NPE Crosstalk test (#6)
S8300
 / 
G700
: This test aborts with Error Code 1412.
X
ND
Station Status and Translation Audit and Update test 
(#36)
X
X
ND
Table 126: Test #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description / Recommendation
ABRT
Necessary system resources could not be allocated to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to abort, escalate the problem.
 1 of 4