Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
464 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
2100
ABRT
Could not allocate the necessary system resources to run this test.
ABRT
Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL
Test failed. Announcements recorded or played back while the clock circuitry 
is not functioning properly sound distorted. The ANN-BD may be defective or 
the Active Tone-Clock circuit pack (TONE-BD) may be marginal and is 
causing this test to fail.
1. Reset the circuit pack via reset board PCSS and then run this test 
again. If the test continues to fail, proceed to Step 2 or 3 as applicable.
!
WARNING:
WARNING:
Replacing the circuit pack results in loss of integrated 
announcements. See 
beginning of this Maintenance procedure.
FAIL 
2. Replace the ANN-BD. Rerun the test. If the test continues to fail, replace 
the Tone-Clock circuit pack.
!
WARNING:
WARNING:
Replacing the TONE-BD causes a COLD 2 reset. See 
Replacing the ANN-BD results in loss of integrated 
announcements. See 
beginning of this Maintenance procedure.
3. If there are recurring alarms on this circuit pack caused by this test 
failing, replace the ANN-BD even if the previous steps were successful.
PASS
Announcement record/playbacks should have clear sound quality. 
User-reported troubles on this circuit pack should be investigated using other 
circuit packs and port tests. Refer to 
page 465 for a description of the port tests.
Table 138: TEST #212 clock match inquiry test  (continued)
Error
code
Test
result
Description/ Recommendation
 2 of 2