Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
872 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented. By clearing error codes associated with the Digital 
Looparound test, you may also clear errors generated from other tests in the testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk test verifies that this port’s NPE channel talks on the selected time slot and 
never crosses over to time slots reserved for other connections. If the NPE is not working 
correctly, 1-way and noisy connections may be observed. This test is usually part of a port’s 
long test sequence and executes in about 20 to 30 seconds.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1.  D = Destructive; ND = Nondestructive
Digital Looparound test 
(#171)
X
X
ND
NPE Crosstalk test (#6)
X
ND
Conference Circuit test (#7)
X
ND
Audit Update test (#36)
X
X
ND
Table 297: Test #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description / Recommendation
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1000
ABRT
System resources required to run test are not available. The port may be 
in use on a valid call. Use status data-module to determine when the 
port is available for testing.
1. Retry the command at 1-minute intervals up to 5 times.
1001
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
 1 of 2