Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
874 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Conference Circuit Test (#7)
The Conference Circuit test verifies that the NPE channel for the port being tested can correctly 
perform the conferencing function. The NPE is instructed to listen to several different tones and 
conference the tones together. The resulting signal is then measured by a tone detector port. If 
the level of the tone is within a certain range, the test passes.
Table 298: Test #7 Conference Circuit Test 
Error 
Code
Test 
Result
Description / Recommendation
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1000
ABRT
System resources required to run this test are not available. The port may 
be in use on a valid call. Use status data-module to determine when 
the port is available for testing.
1004
ABRT
The port has been seized by a user for a valid call. Use status 
data-module
 to determine when the port is available for testing.
1. Retry the command at 1-minute intervals up to 5 times.
1020
ABRT
An existing Error Type #769 on this port prevented the test from running.
1. Follow the procedure following the Error Log Table for Error Type 
#769.
2000
ABRT
Response to the test request was not received within the allowable time 
period.
1. Rerun the test at 1-minute intervals up to 5 times.
2100
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
Any
FAIL
The conference circuit test failed (possible off-board problem).
1. Busyout and release the port (data line), and then retest.
2. Replace the circuit pack if the test continues to fail.
PASS
The port can correctly conference multiple connections. Investigate 
user-reported troubles on this port using other port tests and examining the 
ADU, external wiring, and customer equipment.