Roberts Gorden TF-Series User Manual

Page of 44
ROBERTS GOR DON
® 
T F-S
E RIE S
 S
UB MI TT AL
 S
HEE T
© 2004 Roberts-Gordon
APPL ICATION S,  ENGI NEE RING AND  DET AI LE D GUID ANCE  ON SYST EMS DE SIGN,  INSTAL LATI ON AND PRODUCT   PE RFORMANCE  IS AVAI LABLE  UPON RE QUEST.  ROBERT S  GORDON
®
 PRODUCT S  ARE  T O BE 
INSTAL LE D ONL Y  IN ACCORDANCE  WI TH L OCAL L AWS, CODES AND  REGUL AT IONS,  AND  ONLY BY A CONT RACT OR QUALI FIE D I N THE  I NST ALL AT ION  AND  SE RVICE  OF GAS-FIRE D HE AT ING  EQUI PME NT.
Tube Clamp Package Installation
Coupling and Tube Assembly
Bolt
Flat
Washer
Tube Clamp
Nut
(Torque 120 in/lb
13.56 Nm)
Description
Part Number
Tube Clamp Package
01318901
Tube Clamp
01396801
Bolt
97113940
Flat Washer
95211600
Nut
92113900
Tube
Tube
Orient coupling so that
the impact block is in the
2:00 or 10:00 o’clock
positions
Closed
Open
Tab
3" (8 cm) to
4" (10 cm)
Slide Bar/Coupling Lock
Coupling
Wide end
Coupling
Tube
Slide Bar/Coupling Lock
A
Close coupling
with tab
B
Start Slide bar/Coupling Lock
onto coupling
C
Insert tubes into coupling
D
Tighten coupling to join tubes
Descr ipti on
Part Number
Coupling
01329600
Slide bar/Coupling Lock
01329700
Tube
91409XXX