Site Preparation and Installation
12
Condensate Pump
The optional condensate pump kit is required when the evaporator is installed below the level of the 
gravity-fed drain line. Refer to the installation instructions provided with the condensate pump kit.
Figure 7
Condensate pump installation
Humidifier Water Supply Line
Units supplied with the optional humidifier package have a 1/4 in. (6.4 mm) FPT connection for water 
inlet. Supply pressure range is 10 psig to 150 psig. Required flow rate is 1 gpm. A shut-off valve 
should be installed in this line to isolate the humidifier for maintenance.
NOTE
DO NOT route humidifier supply line in front of filter box access panel.
Condensate Pump
Condensate 
Pump
Support Bracket
3/4" (13mm) Hose Barb
Supplied on Pump Tank
Flexible Rubber Tubing
3/4" (13mm) FPT
Customer Connection
Condensate Drain
Evaporator or 
Chilled Water
Unit
Power Supply from
Electric Service Power
Block in Fan/Coil Module.
Drain Line
(field supplied)
Notes:
1. 3/4" (13mm) Flexible Rubber Tubing Assembly (Supplied
    with Pump Kit) must be installed on pump end.
2. The High Water Safety Float included with pump must be
    interlocked with unit control.  Wire to terminals 60 & 61 on
    Evaporator terminal strip to shut down unit.
3/8" Compression Fitting
Drain Connection
FRONT OF UNIT
AIR INLET
21 1/2 "
6 5/8 "
10 9/16 "
(268.3mm)
(168.3mm)
(546mm)
DPN000239_Rev0