Gas-Fired Products 200 User Manual

Page of 53
 
 Form 
#43343530 
 
–16– 
JJuly 08
 
 
 
 
Typical Assembly Overview
(PTU 40FT Shown)
Wire Hanger
Flue
Terminal
#10 Self-Drill Screws
(Typical all tube supports,
tube couplings and flue
terminal.)
4"OD x 10Ft. Tube
See section 7
for required tubes.
13” Tube Support Brk.
 with U-Bolt Clamp
 & 5/16" Hex Nuts
Mounting Flange
24 Hole for Aluminized Steel Tubes
  6 Hole for Alumi-Therm Steel Tubes
Gasket
Burner Box
Typical
Overlap
U-Bend
Tube Coupling
(Typical each tube joint.)
Reflector
31” Tube Support Brk.
 with U-Bolt Clamp
 & 5/16" Hex Nuts
8’ - 10’
6 hanging points to be used for suspension for a typical
40ft long system. There must be two hanging points
on the first tube and one on each of the other tubes
Maximum 6” distance
from burner box to the
tube support/hanger
bracket.
8’ - 9’ ¼”
#10 Self-Drill
Screws
(2 each)
Turbulator
(See specifications
section 5 for required
quantities.)
Burner Box
Suspension
Chain