Sterling 882.004400.00 User Manual

Page of 25
Fiberglass Cooling Towers 
Chapter 3: Installation 
Page 13 of 25 
 
Do not let the rigging transfer any load to the cooling tower shell.  Provide support to 
the bottom of the cooling tower when rigging.  Do not rig from the corners of the 
optional base.  Do not rig less than 8 inches from the corners.
3-3 Rigging 
Handle the fiberglass cooling tower shell section very carefully. Until installed and properly 
supported, it is subject to handling damage. See Figure 2 for rigging information. 
Caution!  Use an appropriately rated hoist to support the equipment. 
Figure 2: Rigging Arrangement 
I-beam
Channel
Spreader bar wide
enough to protect
cooling tower shell
Rope stay
The rope stay goes
all the way around the
vertical rope in position.
tower to keep the
 
 
 
 
 
 
3-4  Installing the Fan Package 
Install the fan package after the tower is in position. 
1.  Remove the dunnage securing the fan package to the pallet. 
2.  Carefully rig the package using the lifting eyebolts provided.  
3.  Mounting holes have been pre-drilled at the factory; move the package into position 
and fasten it securely with the stainless steel hardware provided. 
3-5 Installing 
Piping 
Make sure that all piping attached to the cooling tower is externally supported. Do not 
support anything from the cooling tower shell. 
The cooling tower and related fittings and connections are constructed of plastic materials 
and are not designed to bear external weight. 
Do not apply high torque to the fittings that are made up into the tower fittings. Use a backup 
wrench when applying torque to the fittings. 
Caution!   Use appropriately rated 
hoist to support equipment.