Rinnai RHFE-1004FA User Manual

Page of 62
– 30 –
TESTING
CHECK
Testing Unit
Purge air from gas line.
Refer to pipe sizing chart if in doubt about the size of
the gas line.
Connection can easily be reached from the top, rear
of the unit.  Check for leaks, using soapy water after
turning gas on.
Plug unit in and turn power on, (CAUTION
- 120V
inside unit).
Turn thermostat to “HI”, turn control to “ON”.  Unit
should ignite within 10 seconds.
If unit does not ignite, there may be air in the gas
line, turn control “OFF” then “ON” again.
Check pressure, regulator is factory set, if pressure
is incorrect, check supply before altering regulator.
The appliance must be stopped before testing unit.
Remove the test point screw and connect
manometer to pressure point on the modulating
valve.
Turn the unit to “ON” position using the ON/OFF
button on the operation panel and check pressure.
If pressures are correct remove manometer and
replace test point plug.
Leak test all gas connections.
Fault-Failure Procedure
If unable to get the unit to operate correctly, contact
Rinnai Agent, or Gas Utility.  Please read the fault
finding charts before reporting faults.
Do not use this heater if any part has been under
water.  Immediately call a qualified service
technician to inspect the heater and to replace any
part of the control system and any gas control which
has been under water.
“WARNING” Do not operate appliance with the
panel(s) removed, cracked or broken.
Installation and repair it should be done by a
qualified service person.  The appliance should be
inspected before use and at least annually by a
qualified service person.
More frequent cleaning may be required due to
excessive lint from carpeting, bedding material, etc..
It is imperative that control compartments, burners
and circulating air passageways of the appliance be
kept clean. Ventilating system should be inspected
and cleaned annually of all debris and spider webs.
Rinnai's service assistance telephone number is
1/800/621
−9419.
WARNING:  DO NOT OPERATE UNIT UNTIL PROPER INSTALLATION HAS BEEN COMPLETED.