Sterling 882.00295.00 User Manual

Page of 72
Large Dehumidifying Dryers 
Maintenance 
56 
Chapter 6:  Maintenance 
6-1   Maintenance Schedule 
The checklist below contains a list of items that should be inspected and/or replaced to keep 
your Large Dehumidifying Dryer operating at peak efficiency.  Perform each inspection at 
the regular intervals listed below. 
Dryer Model # 
 
Serial # 
 
EVERY WEEK 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect all filters for wear, 
replace/clean if dirty or  
worn 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
EVERY 
MONTH Jan Feb Mar
Apr May Jun  Jul Aug Sep Oct Nov Dec
Lock out electrical power 
and inspect electrical 
wiring for integrity 
 
 
 
 
 
 
 
 
 
 
 
 
Lock out electrical power 
and check heater 
elements for continuity 
using an ohmmeter 
 
 
 
 
 
 
 
 
 
 
 
 
Check Dew point and 
temperature tracking with 
an external dew point 
monitor and pyrometer 
 
 
 
 
 
 
 
 
 
 
 
 
Visually inspect the 
shifting of the airflow 
valve during one cycle 
 
 
 
 
 
 
 
 
 
 
 
 
 
EVERY YEAR 
Next Scheduled 
Inspection 
Actual Inspection 
Date/By 
Next Scheduled 
Inspection 
Actual Inspection 
Date/By 
Inspect desiccant. Replace 
if brown or broken 
 
 
 
 
 
 
- Photocopy this page for your maintenance records -