Sterling 350-2100 CFM User Manual

Page of 58
350-2100 cfm Dryers 
Chapter 4: Control Panel 
22 of 58 
 
VALVE  POSITION ERROR 
A pair of position switches confirm proper shifting of the valves.   
If full travel is not confirmed by the switches, the cycle will not begin on the new bed.  
 
4-2  Switches and Meters 
 
ON/OFF SELECTOR SWITCH 
This energizes or de-energizes the dryer's control power. 
START/STOP PUSH-BUTTON 
Press this momentary contact switch to start the dryer.  Press this switch to shut down an 
operating dryer. The dryer shutdown sequence is: 
1.  Process heaters shut off immediately. 
2.  Process blower continues to run for 20 minutes to cool the process heater, then shuts 
off. 
3.  The regeneration cycle of the off-line bed will continue until finished, the 
regeneration heaters will shut off, followed by the regeneration blower. 
DEWPOINT METER 
;  This meter indicates the current process air delivery moisture content. 
;  When the Push To Set button is pressed, the meter indicates the Dewpoint Shift 
point. See Section 5-10. 
PUSH TO SET 
This push-button is used when setting or confirming the Dewpoint Shift point. See Section 5-
6. 
DEWPOINT SHIFT ADJUST 
This potentiometer [pot] is used when setting the Dewpoint Shift point. See Section 5-6. 
SHIFT SET SELECTOR SWITCH 
In the "ON" position, the drying temperature is raised or lowered to the ¼ DIN controller's 
alternate temperature - see Section 4-5.
  
OVER TEMPERATURE RESET [Optional] 
This push-button resets the control system to allow restart of heaters and blowers after 
process air temperature has dropped below the high value programmed into the 1/8 DIN 
panel meter (4CNTL) 
This is on dryers equipped with the auxiliary hi-temperature safety option.  
HEATER BURN-OUT INDICATOR METERS [Optional] 
;  The six current indicating meters monitor the current draw on each phase of the 
process and regeneration heaters. 
;  During normal operation, all three meters (phases) should read within one or two 
amps of each other.