Wayne-Dalton AND 9600 User Manual

Page of 48
Tools Needed:
10
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your 
local yellow pages/business listings or go to the 
Find a Dealer section online at www.Wayne-Dalton.com
hEADROOM REqUIREMENT
faIluRE TO sECuREly 
aTTaCH a suITaBlE MOuNTING PaD TO 
sTRuCTuRally sOuND fRaMING COulD CausE 
sPRINGs TO VIOlENTly Pull MOuNTING PaD 
fROM Wall, REsulTING IN sEVERE OR faTal 
INjuRy.
If you just removed your existing door or you are installing a 
new door, complete all steps in PREPaRING THE OPENING. 
for detailed technical information regarding the opening 
preparation, refer to the DasMa Technical Data sheet TDs 
#161 “Connecting Garage Door jambs to Building framing” 
at www.dasma.com. 
The inside of your garage door opening should be framed with 
wood jambs and header. It is recommended that 2” x 6” lumber 
be used. The jambs must be plumb and the header level. The 
jambs should extend a minimum of 12” (305 mm) above the 
top of the opening for TorqueMaster
® 
counterbalance systems. 
for low headroom applications, the jambs should extend to 
the ceiling height. Minimum side clearance required, from the 
opening to the wall, is 3-1/2” (89 mm).
IMPORTANT: ClOsEly INsPECT jaMBs, HEaDER aND 
MOuNTING suRfaCE. aNy WOOD fOuND NOT TO BE sOuND, 
MusT BE REPlaCED.
The jambs and header must be securely fastened to sound 
framing members. Do not place jambs and header over drywall, 
paneling, etc. Heads of fasteners must be flush or below jamb 
and header surface, so they do not interfere with installation 
or operation of new door.
TorqueMaster
®
 counterbalance systems, a suitable mounting 
surface must be firmly attached to the wall, above the header 
at the center of the opening. 
The mounting surface must be 2” x 6” lumber minimum (select 
southern yellow pine lumber. Do not use lumber marked as 
spruce-pine-fur or sPf). 
The mounting surface must be securely attached to block or 
concrete wall with four (4) 3/8” masonry anchors or four (4) 
5/16” x 4” lag screws for a wood structure. 
NOTE: Drill a 3/16” pilot hole in the mounting surface to avoid 
splitting the lumber. Do not attach the mounting surface with 
nails.
WEAThER SEAl:
 
Cut three (3) pieces of weather seal (may not 
be included) to the jambs and header. align the jamb seals with 
the inside edge of the opening. Temporarily nail the weather 
seal to the jamb to keep the bottom section from falling out of 
the opening during installation.
NOTE: Do not permanently attach weather seal to the jamb 
at this time.
hEADROOM REqUIREMENT: Headroom is defined as the space 
needed above the top of the door for tracks, springs, etc. to allow 
the door to open properly. If the door is to be motor operated, 
2-1/2” (64 mm) of additional headroom is required.
NOTE: 6” lHR Conversion kit is available for 12” Radius only. 
Contact your local Wayne-Dalton dealer.
bACkROOM  REqUIREMENT:  Backroom  is  defined  as  the 
distance  needed  from  the  opening  back  into  the  garage  to 
allow the door to open fully.
Preparing the Opening
WARNINg
TRACk TyPE
TorqueMaster
®
 15” Radius track
11-3/4” (299 mm)
12” Radius track
10-1/2” (267 mm)
6” lHR kit
6” (152 mm)
DOOR hEIghT
TRACk
MANUAl 
lIFT
MOTOR 
OPERATED
6’5”, 6’6”, 7’0” 12”, 15” Radius
98” 
(2489 mm)
120” 
(3048 mm)
7’6”, 8’0” 
12”, 15” Radius
110” 
(2794 mm)
132” 
(3353 mm)
WEaTHER sEal
bACkROOM REqUIREMENT
HEaDROOM
BaCkROOM
DOOR
WIDTH
DOOR 
HEIGHT
lEVEl HEaDER
PluMB jaMBs
HEaDER BOaRD 
2” x 6” luMBER 
PREfERRED
suITaBlE MOuNTING 
suRfaCE 2” x 6” 
luMBER MINIMuM
P5
Recommended 
tools from 
page 5
HEaDER
jaMB
jaMB
quICk INsTall TRaCk
jaMB
WEaTHER 
sEal