Lennox Hearth MPDR-3328CNE-B User Manual

Page of 42
19
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
LENNOX HEARTH PRODUCTS  •  MERIT
®
 PLUS DIRECT VENT GAS FIREPLACES (MPD33/35/40/45)  •  INSTALLATION INSTRUCTIONS
Figure 35 
The unitized design of the Secure Vent compo-
nents will engage and seal both the inner and 
outer pipe elements with the same procedure.  
Sealant and securing screws are not required.
Note: An elbow may also be attached to the 
appliance collar.  Attach in the same manner 
as you would a vent section. 
Remember to maintain 1" (25 mm) clearance 
to combustibles, framing members, and attic 
or  ceiling  insulation  when  running  vertical 
chimney sections.
HORIZONTAL (OUTSIdE WALL) 
TERMINATION SYSTEM
F. Install firestop/spacer at ceiling - 
When using Secure Vent, use SV4.5VF firestop/
spacer at ceiling joists; when using Secure Flex, 
use SF4.5VF firestop/spacer. If there is living 
space  above  the  ceiling  level,  the  firestop/ 
spacer must be installed on the bottom side of 
the ceiling. If attic space is above the ceiling, 
the firestop/ spacer must be installed on the 
top side of the joist.  Route the vent sections 
through  the  framed  opening  and  secure  the 
firestop/spacer with 8d nails or other appropriate 
fasteners at each corner.
Secure Vent SV4.5 direct vent system components 
are unitized concentric pipe components featuring 
positive twist lock connection, (refer to Figure 22 
on page 15).  All of the appliances covered in this 
document are fitted with collars having locking 
inclined channels. The dimpled end of the vent 
components fit over the appliance collar to create 
the positive twist lock connection.
A. Plan the vent run - 
Analyze  the  vent  routing  and  determine  the 
types  and  quantities  of  sections  required       
4-1/2" (114 mm), 10-1/2" (267 mm), 22-1/2" (572 
mm), 34-1/2" (876 mm) and 46-1/2" (1181 mm) net 
section lengths are available.  It is recommended 
that you plan the venting so that a joint does not 
occur in the ceiling or roof joists.  Allow for elbows 
as indicated in Figure 25 on page 16
Maintain a minimum 1" (25 mm) clearance to 
combustibles on the vertical sections. Clearances 
for the horizontal runs are; 3" (76 mm) on top, 1" 
(25 mm) on sides, and 1" (25 mm) at the bottom.
B. Frame exterior wall opening - 
Locate the center of the vent outlet on the ex-
terior wall according to the dimensions shown 
in Figure 9 on page 8.  Cut and/or frame an 
opening, 10-1/2" x 12-1/8" (267 mm x 308mm) 
inside dimensions, about this center.
C. Frame ceiling opening - If the vertical route 
is to penetrate a ceiling, use plumb line to locate 
the center above the appliance. Cut and/or frame 
an opening, 10-1/2" x 10-1/2" (267 mm x 267 
mm) inside dimensions, about this center (refer 
to Figure 21 on page 15 ).
G. Support the vertical run sections - 
On the vertical run, support the venting sys-
tem  every  8  feet  (2.4m)  above  the  fireplace 
vent outlet with field provided support straps 
(Plumber's tape).  Attach the straps to the vent 
pipe and secure to the framing members with 
nails or screws. See  Figure 24 on page 15.
H. Change vent direction -  At transition from or 
to a horizontal/inclined run, install the SV4.5E45 
and SV4.5E90 elbows in the same manner as 
the straight vent sections.  The elbows feature 
a twist section to allow them to be routed about 
the center axis of their initial collar section to 
align  with  the  required  direction  of  the  next 
vent run element. Twist elbow sections in a 
clockwise direction only so as to avoid the 
possiblity of unlocking any of the previously 
connected vent sections. See Figure 25 on 
page 16.
I. Continue installation of horizontal/inclined 
sections -  Continue with the installation of the 
straight vent sections in horizontal/inclined run 
as described in Step E. Install support straps 
every 5 ft. (1.52 m) along horizontal/inclined 
vent runs using conventional plumber’s tape. 
See Figure 35, it is very important that the 
horizontal/inclined  run  be  maintained  in  a 
straight (no dips) and recommended to be in 
a slightly elevated plane, in a direction away 
from the fireplace of 1/4" rise per foot (20 mm 
per meter) which is ideal, though rise per foot 
run ratios that are smaller are acceptable all the 
way down to at or near level.  Use a carpenter’s 
level to measure from a constant surface and 
adjust the support straps as necessary. 
E.  Attach vent components to each other - Other 
vent sections may be added to the previously 
installed section in accordance with the require-
ments of the vent tables.  To add another vent 
component to a length of vent run, align the 
dimpled end of the component over the inclined 
channel end of the previously installed section, 
adjusting the radial alignment until the four lock-
ing dimples are aligned with the inlets of the four 
incline channels of the previous section.  Push 
the vent component against the previous section 
until it fully engages, then twist the component 
clockwise running the dimples down and along 
the incline channels until they seat at the end of 
the channels.This seating position is indicated 
by the alignment of the arrow and dimple as 
shown in Figure 23 on page 15.
d. Attach vent components to appliance - To 
attach a vent component to the appliance collar, 
align the dimpled end over the collar, adjusting the 
radial alignment until the four locking dimples are 
aligned with the inlets of the four incline channels 
on the collar (refer to Figure 22  on page 15).
Both of these horizontal vent systems terminate 
through an outside wall. Building Codes limit 
or prohibit terminating in specific areas. Refer 
to Figure 8  on page 7 for location guidelines.
Figures 35, and Figures 39 to 44 on pages 
21 to 23 and their associated  Horizontal Vent 
Table illustrate the various horizontal venting 
configurations that are possible for use with 
these appliances.  Secure Vent pipe applications 
are shown in these figures; Secure Flex pipe 
may also be used. A Horizontal Vent Table sum-
marizes each system’s minimum and maximum 
vertical and horizontal length values that can be 
used to design and install the vent components 
in a variety of applications. 
Push the vent component against the collar until it 
fully engages, then twist the component clockwise, 
running the dimples down and along the incline 
channels until they seat at the end of the channels.  
It is important to maintain the required clear-
ances to combustibles: 1" (25 mm) at all sides 
for all vertical runs; and 3" (76 mm) at the 
top, 1" (25 mm) at sides, and 1" (25 mm) at 
the bottom for all horizontal/inclined runs.
Vertical
Rise
SV4.5E90
Elbow
Horizontal / Inclined Run
SV4.5HT-2
Termination
Firestop/Spacer
SV4.5L6/12/24/36/48
Vent Sections
Support bracket spacing
every 5 ft (1.52 m)
See Figure 24 on page 15 for
vertical vent section support.
SV4.5HT-2
Termination
Support
Brackets
Building
Support
Framing
Ceiling
Fireplace
Exterior
Wall
Exterior
Wall
TYPICAL HORIZONTAL VENT INSTALLATION