Regency P40-NG1 User Manual
Regency
®
P40-1 Direct Vent Gas Fireplace
11
INST
ALLA
TION
INSTALLATION
10-1/4” Above Fireplace
6”
6”
Diagram 1
1) Frame in the enclosure for the unit with framing material. The framed
opening for the assembled kit is 42-1/2" high x 40-1/2" wide x 20-1/16"
deep (1080mm H x 1029mm W x 508mm D), see Diagram 1. Also
see Diagram 2 for corner installations.
deep (1080mm H x 1029mm W x 508mm D), see Diagram 1. Also
see Diagram 2 for corner installations.
Note: When constructing the framed opening, please ensure there
is access to install the gas lines when the unit is installed.
See diagram 3 for details.
See diagram 3 for details.
2) For exterior walls, insulate the enclosure to the same degree as the
rest of the house, apply vapour barrier and drywall, as per local instal-
lation codes. (Do not insulate the fi replace itself.)
lation codes. (Do not insulate the fi replace itself.)
3) The unit does not have to be completely enclosed in a chase. A non-
combustible header must be used. You must maintain clearances
from the vent to combustible materials: See "Clearances" section.
Combustible materials can be laid against the side and back standoffs
and the stove base.
from the vent to combustible materials: See "Clearances" section.
Combustible materials can be laid against the side and back standoffs
and the stove base.
FRAMING & FINISHING
42-1/2"
(1080mm)
40-1/2”
(1029mm)
Min. 20-1/16"
(508mm)
Non-Combustible
Header
(On Edge)
Non-Combustible Studs
(when installing the full screen front only)
The HeatWave Duct Kit has different
clearance and framing requirements,
check the HeatWave manual for details.
clearance and framing requirements,
check the HeatWave manual for details.
Diagram 2
Diagram 3
Note: Height is from the base of the unit. Take into consideration
the hearth height and material.
Height = 42-1/2" plus height of hearth.
WARNING: When installing the Full Screen Doors
The Full Screen Front requires additional non combustible facing and
non-combustible framing. Ensure the 10-1/4" above the fi replace, 6"
on both sides and both the header and side studs are non-combustible
materials. All other clearances, including mantel, remain the same.
non-combustible framing. Ensure the 10-1/4" above the fi replace, 6"
on both sides and both the header and side studs are non-combustible
materials. All other clearances, including mantel, remain the same.
WARNING: When installing the
Full Screen Doors
The Full Screen Front requires
additional non combustible facing
and non-combustible framing.
Ensure the 10-1/4" above the
fi replace, 6" on both sides and
both the header and side studs
are non-combustible materials.
All other clearances, including
mantel, remain the same.
additional non combustible facing
and non-combustible framing.
Ensure the 10-1/4" above the
fi replace, 6" on both sides and
both the header and side studs
are non-combustible materials.
All other clearances, including
mantel, remain the same.
FULL SCREEN DOOR
FACING REQUIREMENTS