Regency L900-NG User Manual

Page of 56
Regency
®
 L900 Direct Vent Gas Fireplace
12
INST
ALLA
TION
INSTALLATION
SIDE NAILING STRIPS
The side nailing strips come attached to the unit. 
There are 3 plates, one on the top and bottom 
that can be folded out as required.
UNIT ASSEMBLY 
PRIOR TO 
INSTALLATION
The Top Facing Support, the Side Nailing Strips 
and the 2 Top Standoffs must be correctly 
positioned and attached to the top before unit 
is slipped into position. 
TOP STANDOFF ASSEMBLY
The top standoffs are shipped in a fl at position 
and must be folded into shape and attached.
1)  Remove the standoffs from the fi replace 
top.
2)  Take each standoff and bend into the correct 
shape. Bend up at the bend lines until the 
screw holes in the standoff and the pre-
punched screw holes on the fi replace  top 
line up. 
3)  Attach the standoff securely to the top 
with 2 screws per standoff (on opposite 
corners).
Side Nailing Strips shown folded out.
FINISHING TEMPLATE
In order to maintain a clean face; the L900 
allows for a 1/8” in overlap of fi nishing material, 
such as rock or tile, on both the left and right 
hand sides of the unit (top and bottom sides do 
not allow for an overlap), this overlap must not 
be exceeded or the glass door will no longer 
open properly. 
Non-combustible wall board is installed up 
to the fl anges on all sides of the unit.  When 
installing any additional facing material use 
the Finishing Template (included with the unit) 
to ensure that the fi nishing material does not 
exceed the allowable overlap.  
The Finishing Template uses two magnets to 
attach itself to the fl ange on the left or right side 
of the unit (see diagram below). Install the facing 
material up to the outside edge (when facing 
the unit) of the fi nishing template.  This template 
may be discarded after the facing material has 
been installed.