COMBUSTIBLE MANTELS
INSTALLATION
Clearances for Bay or Flush Front
WARNING
Fire hazard is an extreme risk if
these clearances are not ad-
hered to.
Fire hazard is an extreme risk if
these clearances are not ad-
hered to.
Because of the extreme heat this fireplace emits, the mantel clearances are critical.
Combustible mantel clearances from top of unit are shown in the diagram below.
Combustible mantel clearances from top of unit are shown in the diagram below.
Note: A non-combustible mantel may be installed at a lower height if the framing is
made of metal studs covered with a non-combustible board.
MANTEL LEG CLEARANCES
Combustible mantel leg clearances as per diagram below:
This drawing is to scale at 1:6 (one inch = 6 inches). Mantel can be installed anywhere in shaded
area or higher using the above scale.
area or higher using the above scale.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant"
or the paint may discolour.
CLEARANCES
The clearances listed below are Minimum dis-
tances unless otherwise stated:
tances unless otherwise stated:
A major cause of chimney related fires is
failure to maintain required clearances
(air space) to combustible materials. It is
of the greatest importance that this fire-
place and vent system be installed only in
accordance with these instructions.
failure to maintain required clearances
(air space) to combustible materials. It is
of the greatest importance that this fire-
place and vent system be installed only in
accordance with these instructions.
Clearance to Combustibles from:
Back
0"
(0mm)
Side
0"
(0mm)
Floor
0"
(0mm)
NOTE: The minimum floor clearance must be
maintained from the top surface of the carpet-
ing, tile, etc.
maintained from the top surface of the carpet-
ing, tile, etc.
Minimum Clearance from Top of Unit to:
Mantel*
Mantel*
min. 7" (177mm)
Ceiling
30"
(762mm) from
top of unit.
Side Wall Clearance
Bay or Flush Front 7-1/2" (191mm)
Bay or Flush Front 7-1/2" (191mm)
Maximum
1-1/2"
projection at
2" minimum
clearance.
1-1/2"
projection at
2" minimum
clearance.
The HeatWave Duct Kit has different
clearance and framing requirements,
check the HeatWave manual for details.
clearance and framing requirements,
check the HeatWave manual for details.
Vent
1-1/2" (38mm) Flex
1-1/4" (32mm) Simpson Dura-Vent
1-1/4" (32mm) Simpson Dura-Vent
Alcove Clearances:
Max. Depth
Max. Depth
36"
(914mm)
Min. Width
48"
(1219mm)
Min. Height
59"
(1499mm)
* see mantle clearance instructions (page 7).