Desa E36L User Manual

Page of 28
www.desatech.com
111076-01F
6
6.  Swing  junction  box  with  harness  to  left 
side while pulling sufficient length of har-
ness out through control panel cover to 
reach mounting location on left side.
7.  Reinsert retaining flange through slot and 
swing screw mounting tab back through 
notch as before.
8.  Slide  junction  box  down  until  mounting 
holes line up and replace inner retaining 
cover.
9.  Pull  end  of  3  wire  Romex  supply  line 
through universal strain relief bushing in 
remaining cover.
10. Strip back outer Romex to about 4” and 
connect black, white and green wires ac-
cordingly using approved connectors.
Screws 
and 
Outer 
Cover
Junction Box
Mounting 
Tab
Notch
Retaining 
Flange
Slot
Screws and 
Outer Cover 
from Other Side
Cover with 
Universal 
Strain Relief
Figure 7 - Relocating Junction Box to 
Left
INSTALLATION
Continued
Junction Box
Figure 8 - Removing Shipping Brace
Foam 
Shipping 
Brace
Motor.
Mount
11. Tuck  tailing  wires  into  junction  box  and 
replace cover using 2 remaining screws.
12. Tighten  down  strain  adjustment  on  uni-
versal bushing until Romex sheathing is 
secured.
IMPORTANT: Inspect components and wir-
ing for damage before connecting power to 
unit. If any components are found damaged, 
contact an authorized dealer for original DESA 
Heating Products replacement part(s) or call 
DESA  Heating  Products  at  1-866-872-6040 
for referral.
IMPORTANT: Prior to operation remove foam 
shipping  brace  located  under  motor  mount 
(see Figure 8).