Bard W**H User Manual

Page of 19
Manual 2100-516H 
Page  6 of 19
FIGURE  2
HEAT PUMP WITH OPTIONAL MFAD, CRV & ERV
VENTILATION PACKAGING WITH PROGRAMMABLE THERMOSTAT (RECOMMENDED)
1
6
5
2
4
3
3
4
if optional CO  controller is used.
Unit
C
G
R
Y
E
Y1
W2
W1
O1
DH
L
B
W3
Terminal Block
24V Low Voltage
Ventilation Packaging with Programmable Thermostat (Recommended)
Figure 2
Low Voltage Wiring Diagram
C
O/B
Y1
R
G
W2
Y O/D
W1/E
Heat Pump with Optional MFAD, CRV, and ERV
Bard part #8403-060
Thermostat
Programmable
L
A
Y2
Red
Orange
Black
2
Brown/White
Ventilation Packages
Electronic
Red
Factory Jumper Installed
Do not connect "A" from tstat #8403-060
Black
MFAD
2
ERV
CRV
during scheduled occupied periods
set to programmed for the "A" output to function 
Must be configured to programmable and fan
2
2
4
optional CO  controller is used.
Connect orange wire to "G" only if
3
1
2
1
MIS-2633 C
Optional CO  Controller
Bard part #8403-067