9.2 Tools for Site Adjustment 
 
 
You will need the following equipment and reference material in order to easily carry out site adjustment. 
 
Item Contents 
Note 
Measurement 
instruments 
Tester 
To check the wiring and the voltage 
Reference 
material 
All necessary drawing of the air 
conditioning control system 
 
 
BACnet IF Operation Manual 
This manual 
 
Instruction Manual and Installation Manual 
for each air conditioner unit and controller 
 
Other 
material 
Floppy disk 
Used when copying data 
 
CD-R 
Used to store generated data and copy it to 
the site PC 
 
BACnet IF CD 
BACnet IF setup disk 
 LAN 
cable 
 
 usual 
maintenance 
tool 
 
 
 
9.3 Step 1: Test operation from centralized controller G-50A 
 
Perform only the test operation of the air-conditioning system of the central controller G-50A. 
 
 
Ether BACnet 
Building Automation System   
BACnet IF 
G-50A 
Step 1 
Power 
supply unit
HUB 
LAN
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(1) Preliminary check 
Check that the test operation of the air conditioner has been completed. 
Check that the central controller G-50A is set to Group and Interlock. 
(The initial setting is executable using the initial setting tool or the G-50A.) 
 
(2)  Test operation from central controller G-50A 
After supplying power to the central controller G-50A and all air conditioners, perform the test 
operation from the central controller G-50A, and check the operation state of each unit. 
*  For the test operation method, refer to the installation manual for the air conditioner or the central 
controller G-50A. 
 
 
 
34