York H*RD018 THRU 060 User Manual

Page of 24
254892-YTG-C-0606
                            
8
Unitary Products Group
PROCEDURES:
1. Unit factory charge listed on the unit nameplate includes refrigerant for the condenser, the smallest evaporator and for 15 feet of inter-
connecting 
line tubing.
2. Verify the TXV and additional charge required for specific evaporator coil in the system using the above table.
3. Additional charge for the amount of interconnecting line tubing greater than 15 feet at the rate specified in the table above.
4. Permanently mark the unit nameplate with the total system charge. Total System Charge = Base Charge (as shipped) + adder for 
evaporator + adder for line set.
G4FA036S14T2A 0 
G4FA048S17T2A –
G4FA048S17T2C –
G4FA048S21T2A –
G4FA048S21T2C –
G4FA060S21T2C 
G4FA060S24T2C 
G4FD036H17T2A  0 0 –
G4FD036H21T2A –
G4FD042H21T2A –
G4FD042H21T2C –
G4FD046H17T2A –
G4FD046H17T2C –
G4FD048H21T2C  –
0 0 –
G4FD048H24T2C  –
0 0 –
G4FD060H24T2C 
G4FD061H24T2C 
F4FP040H06T2A 0 
F4FP042H06T2A –
F2FP048H06T2C –
FOOTNOTES:
1. Systems matched with furnace or air handlers not equipped with blower-off delays may require blower Time Delay Kit  2FD06700224.
Additional R-22 Charge / Orifice Size for Various Matched Systems - 3 Phase (Continued)
Outdoor Unit 
H1RD030S(25,46)
H1RD036S(25,46)
H1RD042S(25,46)
H1RD048S(25,46)
H1RD060S(25,46)
Required TXV
1TVM2A1
1TVM2A1
1TVM2C1
1TVM2C1
1TVM2C1
Factory R-22 Charge, lbs-oz
5 - 13
6 - 0
8 - 13
8 - 6
10 - 2
Indoor Coil
1
Additional Charge, Oz