UNIT START-UP CHECKLIST
MODEL NO.:
DATE:
______________
SERIAL NO: _____________________________________
TECHNICIAN: ___________________________________
I. PRE-START-UP:
j
VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j
VERIFY INSTALLATION OF OUTDOOR AIR HOOD
j
VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD (48PD ONLY)
j
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j
VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
j
VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE (48PD ONLY)
j
CHECK GAS PIPING FOR LEAKS (48PD ONLY)
j
CHECK THAT INDOOR--AIR FILTERS ARE CLEAN AND IN PLACE
j
CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE
j
VERIFY THAT UNIT IS LEVEL
j
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND VERIFY SETSCREW IS TIGHT
j
VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
j
VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION
j
VERIFY INSTALLATION OF SPACE SENSOR
j
VERIFY CONFIGURATION VALUES FOR ELECTRONIC CONTROLS (REFER TO CONTROL SET UP CHECKLIST)
j
VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR AT LEAST 24 HOURS
j
VERIFY THAT THE VFD IS IN AUTO MODE
II. START-UP
ELECTRICAL
SUPPLY VOLTAGE
L1--L2
L2--L3
L3--L1
COMPRESSOR AMPS—COMPRESSOR A1
L1
L2
L3
—COMPRESSOR B1
L1
L2
L3
—COMPRESSOR C1
L1
L2
L3
ELECTRIC HEAT AMPS (IF EQUIPPED)
L1
L2
L3
SUPPLY FAN AMPS
_______
L1
L2
L3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
F DB (Dry Bulb)
RETURN-AIR TEMPERATURE
F DB
F WB (Wet Bulb)
COOLING SUPPLY AIR
F
GAS HEAT SUPPLY AIR (48PG)
F
ELECTRIC HEAT SUPPLY AIR (50PG)
F
PRESSURES
GAS INLET PRESSURE
IN. WG
GAS MANIFOLD PRESSURE
STAGE NO. 1
IN. WG
STAGE NO. 2
IN. WG
REFRIGERANT SUCTION
CIRCUIT A
PSIG
CIRCUIT B
PSIG
CIRCUIT C
PSIG
REFRIGERANT DISCHARGE
CIRCUIT A
PSIG
CIRCUIT B
PSIG
CIRCUIT C
PSIG
j
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GENERAL
j
ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS