TEMPERATURE/PRESSURE GAUGE
This boiler is equipped with a dial type temperature/pressure
gauge.  This gauge is factory installed in the out let side of the
boiler bypass piping.  The gauge has one scale to read system
pressure and a separate scale to read water temperature in °F.  The
tem 
per 
ture/pressure gauge is provided to meet code
requirements.  Water temperatures can be more accurately
monitored from the data provided in the Command Display.
TYPICAL HEATING BOILER
INSTALLATIONS
General Plumbing Rules
1.
Check all local codes.
2.
For serviceability of boiler, always install unions.
3.
Always pipe pressure relief valve to an open drain.
4. 
Locate system air vents at high est point of system.
5.
Expansion tank must be installed near the boiler 
and on the suction side of the system pump.
6.
Support all water piping.
PLACING THE BOILER 
IN OPERATION
Pre-Start Check List
1.
Review the location of the boiler, clearances from 
combustible surfaces and available service 
clearances.
2.
Review the installed Vent System.  Ensure that all 
vent  components are Category IV material with 
adequate clearance from combustibles.
3.
Ensure that the boiler condensate drain and all vent 
system condensate drains are properly routed to 
an ac cept able floor drain or neutralization system.
4.
Ensure that an optional condensate neutralization 
system is properly in 
stalled if required by codes.
5.
Review the vent termination point for proper 
location and clearances.
6.
Ensure that proper volumes of com 
bus 
tion and 
ventilation air are pro vided to the mechanical room.  
If a separate combustion air pipe is used, ensure 
that it is properly sized, sealed and terminated.
7.
Review the water piping from the boiler to the 
system.  The boiler must be installed in a primary/
secondary piping system.  Review the diameter and 
equivalent length of the installed piping to and 
from the boiler to ensure proper flow. 
8.
Ensure that a properly sized primary system pump 
is installed with an expansion tank. 
9.
Check system pressure.  Ensure a  minimum of 12 
PSI and not more than the rated pressure of the 
relief valve. 
10.
Review the installed gas piping from the meter to 
the boiler.  Ensure that the gas pipe, meter and any 
regulators are adequately sized. 
11.
Review the field wiring and elec 
tri 
cal service for 
both the boiler controls and pump.  Ensure that the 
electrical service(s) is adequately sized.
12.
Review wiring to an energy man 
age 
ment system  
and wiring to any remote temperature sensors.
Boiler Set-Up
13.
Ensure that the boiler and piping system are full of 
water.  Bleed all air from the secondary loop and 
bypass piping on the boiler.
14.
Check system for any water leaks.
15.
Check system for installation of glycol or water 
treatment.
16.
Turn on power to the primary system pump and 
the integral boiler secondary pump and verify 
operation.
Boiler Operational Checks
17.
Turn the boiler main power switch to the “ON” 
position and the run/stop switch to the “STOP” 
position.
18.
Verify operation of the Excel 10 and Command 
Display.
19.
Program the adjustable points from the Command 
Display.
20.
Turn the run/stop switch to the “RUN” position to 
start boiler operation. Note: The bypass must go 
through the synchronization process before 
start-up begins.
21.
Push the resets for low water lev 
el, high water 
temperature and flame failure.
22.
Carefully follow the bypass ad 
just 
ment procedure 
to  set maximum flow to the boiler at 90 GPM.  Verify 
by check 
ing temperature rise while burner is firing at
100% of rated input.
23.
Install a manometer on the gas supply to the boiler 
and verify minimum gas supply pressure as the 
burner fires at 100% of rated input.
24.
Verify operation of safeties as necessary (low water 
cut-off, high limit, gas pressure, etc.).
25.
Turn the run/stop switch to the “STOP” position.
26.
Verify that all adjustable points in the Command 
Display are set as required.
27.
Reconnect any wiring disconnected during the 
boiler set-up.