Piping Installation
1) Remove parts bag from boiler crate.
2) Install safety valve (spindle must be in vertical position) into tapping on boiler left side (see Figure 1) using the 3/4” NPT
nipples and elbow supplied.
3) Pipe the discharge of the safety relief valve to a location where water or steam will not create a hazard or cause property
damage if the valve opens. The end of the discharge pipe must terminate in an unthreaded pipe. If the safety valve
discharge is not piped to a drain it must terminate at least 6 inches above the floor. The termination of the safety valve
discharge piping must be in an area where it is not likely to become plugged by debris or subjected to freezing.
4) Install drain valve into tapping on boiler left side using the 2 x 3/4 bushing provided (see Figure 1).
5) Connect system supply and return to boiler. See Figure 11. The BSI069 - BSI172 require only one supply riser. Two supply
risers are required on the BSI207 and larger sizes.
6) Piping with a Chiller - If the boiler is used in conjunction with a chiller, pipe the boiler in parallel with chiller. Use isolation
valves to prevent chilled water from entering the boiler.
DANGER
PIPE  SAFETY  VALVE  DISCHARGE  TO  A  SAFE  LOCATION.
DO  NOT  INSTALL  A  VALVE  IN  THE  SAFETY  VALVE  DISCHARGE  LINE.
DO  NOT  MOVE  SAFETY  VALVE  FROM  FACTORY  LOCATION.
DO  NOT  PLUG  SAFETY  VALVE  DISCHARGE.
DO  NOT  INSTALL  A  SAFETY  VALVE  WITH  A  SETTING  GREATER  THAN  15  PSI.