Monessen Hearth CSDV30DLP User Manual

Page of 44
18
58D6056
CSDV Series Direct Vent Gas Stove
VENTING INSTALLATION 
HOT
H
1
V
1
H
V
ST1141
Horiz term 3 elbows
Figure 23 - 
Horizontal Termination Configuration for 
Rigid Venting Using Three (3) 90° Elbows 
with Termination at 90° to Stove
Table 4 - Horizontal Venting with Three (3) 90° 
Elbows
 
maximum 
 
 
 
Horizontal 
 
Vertical minimum
 
(H + H
1
CSDV20 (V)  CSDV30 (V)  CSDV40 (V)
 
24"  
41Z\x"  
52Z\x" 
54Z\x" 
 
 
(610 mm) 
(1054 mm) 
(1334 mm) 
(1384 mm)
 
20' 
95Z\v" 
98C\v" 
102Z\v" 
 
 
(6 m) 
(2419 mm) 
(2508 mm) 
(2597 mm)
NOTE: Add 1/4" rise per 12" horizontal length 
of pipe.
INSTALLATION FOR VERTICAL TERmINA-
TION
1.  Determine  the  route  your  vertical  venting  will  take. 
If  ceiling  joist,  roof  rafters  or  other  framing  will 
obstruct  the  venting  system,  consider  an  offset.   
Refer to Figure 24 
to avoid cutting load bearing mem-
bers. 
NOTE: Pay special attention to these installation instructions 
for required clearances (air space) to combustibles when 
passing  through  ceilings,  walls,  roofs,  enclosures,  attic 
rafters, etc. Do not pack air spaces with insulation. Also 
note maximum vertical rise of the venting system and any 
maximum  horizontal  offset  limitations.  Offsets  must  fall 
within the parameters shown on Page 14, Figure 13.
2.  Set stove in desired location. Drop a plumb line down 
from the ceiling to the position of the burner system exit 
flue. Mark the center point where the vent will penetrate 
the ceiling. Drill a small locating hole a this point. 
FP1969
offset w/ wallstrap
Figure 24 - 
Offset with Wall Strap and 45° Elbows 
Roof Flashing 
Wall Strap 
45° Elbows 
Ceiling Firestop 
FP1669
NOTE: V + V
1
 = 20' (6 m) maximum.