England's Stove Works 25-PDV User Manual

Page of 24
     touch pad. This will start the upper auger, bottom auger and exhaust  
     blower. The room air blower will start later as the stove reaches the pre-set blower  
     temperature (see “Control Board” section for further explanation). 
 
5.  Check to be sure both augers and the exhaust blower are operating before connecting the  
      unit to the flue system.  Be sure to “dry run” your unit for 20 minutes  
     before connecting it to the flue (it should stop automatically after 20 minutes). 
 
Proper Impingement (Baffle) Plate Placement  
in Pellet Stove Firebox 
 
Occasionally in shipping, the impingement (baffle) plate may shift out of its proper 
position.  If this is the case with your stove, follow these instructions to return the plate 
to its proper position. 
 
1.  Remove the plate from the stove, holding the plate by its tab handle, with the 
cutout notch facing upwards. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2.  Turn the notched end into the doorway (as shown above), and lift the plate up to 
allow the bottom of the plate to fit in the doorway. 
3.  Let the bottom of the plate rest on the firebox, and then push the bottom of the 
plate flush against the back wall of the firebox.  At this point, the plate will lean 
forward (toward the front of the stove) slightly, and will come in contact with the 
front of the stove above the door. 
4.  Finally, center the plate on the firebox, so that it will be centered above the fire 
when the stove is in operation. 
 
Customer Service:  (800) 245-6489 
www.englandsstoveworks.com