 Installation of Wall Venting Kits 
Direct Vent Kit 
VENT TERMINAL
RADIATION SHIELD
-min 1"
-max 60"
 
 
 
Direct Vent 
Direct Vent Details 
1.  Move the stove to its position; 
2.  Install temporary a 8 in. section (4) to visualize where the opening to be done thru the wall. Center of the 
opening should be at about 23 ½ “above the base of the stove; 
Note: Horizontal run should have a slope of ¼ in per foot. 
3.  Make a 10-1/2" x 10-1/2" opening in the wall, 23-1/2" 
inches in order to introduce the radiation shield thru 
the wall; 
4.  Cut the radiation shield to length if necessary and 
install as shown. Secure with four #10 1” wood screws;
5.  Install the vent terminal (13) with 2 ½ screws (12). You 
may want to remove the vent casing for easy access 
and manipulation, Keep only in place the wall plate 
6.  Insert the 8 in. pipe into the round opening of the 
interior black wall plate (7). Fix the insulation pad (9) 
around the 8 in. pipe with the aluminum tape; 
7.  Keeping the insulation joint of the 8 in. pipe down, 
insert it into the vent terminal wall plate; 
8.  Secure the 8 in. pipe to vent terminal wall plate with 
the metal screw; 
9.  Fix finally the vent terminal wall plate with six 2 ½ in 
screws (12). 
10. Insert the 5 in. flexible pipe (3) into the 8 in. pipe and 
fix it to the vent terminal casing. Use high temperature 
silicone and one locking band to secure it in pace; 
NOTE: All joints must be sealed with RTV silicone, 315
°C. 
(600
°F) temperature resistance. 
11.  Install the vent casing and the cover in place 
12. Seal around the terminal to prevent water leakage into 
the house  
 
CUT TO LENGTH
10-1/2" X 10-1/2"
OPENING