ULTRA FLAME DIRECT VENT GAS STOVE 
12 
Direct Vent Kit for Basement Installation 
1.  Move the stove to its position; 
2. Install temporary an 8 in. 
section (4) to visualize where 
the opening to be done thru the 
wall. Center of the opening 
should be at about 23 ½ “above 
the base of the stove; 
Note: Horizontal run should have a 
slope of ¼ in per foot. 
3. Make a 10-1/2" x 10-1/2" 
opening in the wall, 23-1/2" 
inches in order to introduce the 
radiation shield thru the wall; 
4. Cut the radiation shield to 
length if necessary and install 
as shown. Secure with four #10 
1” wood screws; 
5.  Install the vent terminal (13) 
with 2 ½ screws (12). You may 
want to remove the vent casing 
for easy access and 
manipulation, Keep only in 
place the wall plate; 
 
Basement Installation 
6.  Insert the 8 in. pipe into the round 
opening of the interior black wall 
plate (7). Fix the insulation pad (9) 
around the 8 in. pipe with the 
aluminum tape; 
7.  Keeping the insulation joint of the 8 
in. pipe down, insert it into the vent 
terminal wall plate; 
8.  Secure the 8 in. pipe to vent terminal 
wall plate with the metal screw; 
9.  Fix finally the vent terminal wall plate 
with six 2 ½ in screws (12). 
10. Insert the 5 in. flexible pipe (3) into 
the 8 in. pipe and fix it to the vent 
terminal casing. Use high 
temperature silicone and one 
locking band to secure it in pace;  
NOTE: All joints must be sealed with 
RTV silicone, 315
°C. (600°F) 
temperature resistance. 
CUT TO LENGTH
10-1/2" X 10-1/2"
OPENING