Drolet HT-2000 User Manual

Page of 28
 
13
CLEARANCES 
 
It is of utmost importance that the clearances to combustible material be scrupulously 
respected upon installation of the stove you have selected. Refer to the tables below : 
 
 
Figure 6: Clearances to combustibles 
 
CANADA 
Single pipe / Double pipe 
Model 
HT-1600 
15/12 
16/16 
12/10 
20.8/17.8  28.7/28.7  25.2/23.2 
HT-2000 
19/10 
19/14 
11/8 
25.4/16.4  33.1/28.1  25.5/22.5 
USA 
Single pipe / Double pipe 
Model 
HT-1600 
15/12 
16/16 
12/10 
20.8/17.8  28.7/28.7  25.2/23.2 
HT-2000 
19/10 
19/14 
11/8 
25.4/16.4  33.1/28.1  25.5/22.5 
 
• 
Floor to ceiling height must be at least 7' (84") in all cases. 
• 
The clearance between the flue pipe and a wall are valid only for vertical walls and for 
vertical flue pipe. 
• 
The flue pipe must not go through roof trussing, an attic, a wardrobe or similar spaces; 
neither a floor or combustible partition. 
• 
A flue pipe crossing a combustible wall must have a clearance of 18" minimum. 
• 
To  reduce  flue  pipe  clearances  from  combustible  materials,  contact  your  local  safety 
department.