Dometic 3000 User Manual

Page of 24
5
 MAINTENANCE SCHEDULE
Maintenance intervals and normal parts replacement vary widely depending on numerous factors such as frequency 
of system use, quality of flushing water, etc. The following chart is intended strictly as a general guide in keeping 
the sanitation system 100% ready for any conditions of use.
Maintenance Procedure
Recommended  
Date of Service
Parts Required
Toilet flush ball seal cleaning  
Tighten toilet seat mounting 
hardware
Monthly 
Monthly (or as needed)
SeaLand Bowl and Seal Cleaner 
N/A
ROUTINE MAINTENANCE
Replace duckbill valves in Vacuum 
Pump or Vacuum Generator
Replace flush ball seal and flush 
ball (if needed)
Every three years
 
 
Every three years
Duckbill Valve Kit 
 
Flush Ball Seal
Flush Ball
MAJOR SYSTEM MAINTENANCE
 SPARE PARTS
The following parts should be kept available at all times:
Description
Part Number
Quantity
Where Used
Flush Ball Seal 
Flush Ball 
Water Valve 
Vacuum Breaker Kit 
Vacuum Switch Kit 
1.5-inch Duckbill Valve Kit  
           (2 ea. per kit)
see parts list
see parts list
see parts list
see parts list
see parts list
see parts list
1
1
1
1
1
1
All-ceramic toilet 
 
 
 
Vacuum generating system
 ORDERING PARTS 
Dometic is ready to assist you in the event service is required. Before calling, please have the following information 
available. Your cooperation in having this information ready is appreciated and allows us to better meet your needs.  
Please refer to the Parts Distributor list in the Customer Service section (page 22).
1.  Toilet Model Number
2.  Serial Number
3.  Part Number, Description and Quantity (see parts list insert)
 CLEARING DISCHARGE LINES
Sanitation hoses should be cleared if toilet will not be needed for an extended period of time (more than two weeks).  
1.  Fill toilet bowl with water and add 4 oz. (120 ml) of biodegradable laundry detergent (should NOT contain bleach). 
2.  Flush toilet, holding pedal down for about two minutes. Close flush ball.
3.  Turn off water supply to toilet. 
4.  Flush the toilet without water, allowing the vacuum pump to shut off after the flush. Repeat three times. (This proce-
dure will minimize any remaining water in the sanitation hoses.) 
5.  Turn off power to the vacuum pump.
6.  Completely pump out holding tank.
If system will be subjected to freezing temperatures, please follow above procedure, then winterize system as described 
in this manual.