GE GP94DNSRSA User Manual
![GE](https://files.manualsbrain.com/attachments/ab9edb4caba5619c2fde3c8024ebd3386de893ab/common/fit/150/50/5e42700264754ddc6c8abde125a62fae9215a8ad130cb92d4b61e1d54d06/brand_logo.jpeg)
3
Installation Instructions
TOOLS YOU WILL NEED
• Pipe Wrenches (2)
• Gloves
• Adjustable Pliers
• Safety Glasses
• Screwdrivers (2)
• Wire Cutters
MATERIALS YOU WILL NEED TO SUPPLY
• Soap Solution
• Pipe Fittings Required:
• Pipe Compound
– Unions
• Approved Venting
– Ball Valves
• 5/8″ ID PVC Flexible
– Drain Valves
Tubing
– Pressure Relief Valve
• 2 Conductor 22 AWG Wire for Remote Control
• Single Gang Electrical Box
• Wire Nuts
• Concrete Wall Anchors (Optional)
Your installation components may vary.
PARTS PROVIDED
Locate the parts packed with the Water Heater.
Gas Valve 3/4″ FNPT Ball Valve
4 #10 x 1
1
⁄
4
″
Wood Screws
OTHER TOOLS THAT MIGHT BE REQUIRED
• Hammer Drill with Concrete Bits
• Saw
• Threading Machine with Heads and Oiler
• Core Drill with Diamond Head
• Torch Set
• Copper Tubing Cutter
• Steel Pipe Cutter
OTHER MATERIALS THAT MIGHT BE NEEDED
• Heat Tape
• Pipe Insulation
• Electrical Wire and Conduit per Local Code
• Air Inlet Screen
• Optional Pipe Cover AGTPCM
• Optional Remote Controller AGTRC1