A&D MS-70 User Manual

Page of 75
MS-70 / MX-50 / MF-50 / ML-50 
14 
 
 
6.
6.
6.
6.  Preparation
Preparation
Preparation
Preparationssss
    
    
 
6.1.
6.1.
6.1.
6.1.  Installing the Analyzer
Installing the Analyzer
Installing the Analyzer
Installing the Analyzer    
 
 
1.  Select the place to install the analyzer.   
Refer "3.1.Installing the Analyzer". 
 
 
2.  Level the analyzer by adjusting the leveling feet 
and confirm it using the bubble spirit level. 
 
  3.  Read the power supply voltage label on the back of 
the heater cover.   
 
  Confirm that voltage, frequency and outlet type 
is correct for your local voltage. 
 
 
Confirm that the rated voltage of the halogen 
lamp is correct to your power supply voltage. 
 
Voltage 
Label 
Power Supply Voltage
The Rated 
Voltage of the 
Halogen Lamp
100 - 120 V  AC 100 V to AC 120 V
AC 120 V 
200 - 240 V  AC 200V to AC 240 V
AC 240 V 
 
 
  4.  Confirm that the power switch is 
"OFF" position. 
 
  5.  Connect the power cord. Ground 
the analyzer with the earth 
terminal on the power cord. 
 
 
6.  Align the guide hole of the breeze 
break ring to the guide on body. 
 
 
7.  Install the pan support.   
Align together the 
 signs on the 
pan support and body. 
 
 
  8.  Put the sample pan on the pan 
handle. 
 
  And hook the pan handle on the 
notch in the rim of the breeze 
break ring. 
 
 
 
Leveling foot 
Bubble spirit level 
Voltage label 
Earth terminal 
Power cord 
Outlet with a 
earth terminal 
Example
Sign 
 on pan support
Sign 
 on body 
Guide hole
Sample pan 
Pan handle 
Pan support
Breeze break ring
Guide on body
Notch in the rim
Notch in the rim