4. Main earth terminal
2. Sealing connection
1. Cable reliefs
2.4  Mains power connection between the DELTABOOSTER  
 
and the supply network (cf. Fig. 5)
All measurements and connections described below should be carried 
out by authorized specialists !
1)  The 
DELTABOOSTER should be connected to a three-phase mains supply at the rated 
voltage, cf. the model plate. Max. 125 Amp pre-fuses.
2)  The connection should be established through a flexible rubber  cable with 3 phase cores  
and one earth conductor to be led through the sealing connection (2) and into the bottom of 
the switchboard through the open angle flange (3). The angle flange is opened by loosening 
two nuts. The cable should be connected direct at the main switch S1 and the main earth 
terminal (4). When the cable has been properly mounted in the main switch S1, the angle 
flange should be closed around the sealing connection (2) and the cable placed in the two 
cable reliefs (1).
  The cable should be rated to the existing current consumption  which has been stamped on 
the 
DELTABOOSTER model plate. It is  advisable to apply a cable with a conductor cross 
section of minimum 25  in preparation for a later expansion.
3)  It is also advisable to take additional precautionary measures to protect the user by installing 
a Residual Current Device (RCD) / Ground fault circuit interruptor (GFCI) in the 
DELTA-
BOOSTER supply line.
4)  Finally, check that fuses F1 - F2 and F3 (cf. wiring diagram) have been mounted in the  re-
tainers and that the overload cut-out Q1-Q? has been connected  and set correctly (cf. C3K 
model plate).
5)  With an appropriate measuring equipment the connection of earth cables from the outlet of 
the fixed installation to a metallic part on the high pressure outlet of the machine should be 
checked. The phase conductors of the supply cable should be subjected to a high voltage 
test with the main switch in off position.
  At Nilfisk-ALTO the 
DELTABOOSTER has been tested on the above-mentioned items as a 
separate machine.
6)  The door to the switchboard should be  closed and locked. The system is now ready for run-
ning in and function testing.