Panasonic ESB92D User Manual

Page of 7
Design and specifi cations are each subject to change without notice.  Ask factory for the current technical specifi cations before purchase and/or use.
Should a safety concern arise regarding this product, please be sure to contact us immediately.
Power Switches
Item
Information (Requirements)
Common
C-1
Inquiry purpose
New use, Modifi cation, Others (                         )
C-2
Modifi cation
Previous supplier
Conventional part No.
Purpose
C-3
Application
Equipment
Environment
Indoor/Outdoor use, Stationary/Portable set, High humidity, SO
2
, NaCl
Temperature
(        °C) to (        °C)
Regula
tions
S-1
Safety
Standards
(Ratings)
UL
CSA
TV-5
SEMKO   DEMKO
VDE         NEMKO
BEAB      FIMKO
SEV         (SETI)
4 A/128 A 250 Vac
(Based on IEC standards)
Others
Shapes
/D
imensions
M-1
Operation
Operation type
Push 
type, 
Others 
(       )
Operating force
When specially requested (    N)
M-2
Circuit Diagrams
SPST, DPST
M-3
Lever length (Push type)
18.0 mm
Travel (Push type)
1.5  mm, 2.5 mm
M-4
Mounting
Mounting holes
2-M3
҂0.5 Tap, 2-f3.2 hole W/O Mounting Plate, Others (                   )
Supporting legs
Necessary (PWB mount type, Solder lug type), Unnecessary
Mounting height
PWB to center of rod
M-5
Terminals
Shape
PWB, Solder lug, Others (                 )
Connection
Manual soldering, Wave soldering
M-6
Lever top 
dimensions
Width 
(     mm) 
҂ 
Height 
(     mm) 
҂ 
Length 
(     mm)
Ot
h
e
rs
L-1
Special requirements for endurance
L-2
Special requirements for safety
L-3
Other questionnaires
When specifying Power Switches, please take advantage of our standard products for better price and delivery.
Please inquire about the following items before ordering.
✽  Power switches described here are not under jurisdiction of the Electrical Appliance and Material Safety Law (Japan), but comply with its
tech ni cal requirements.
Notes:
1. When you specify custom types (custom-made), new tooling and jigs, and/or equipment may be required.  It will be necessary to confi 
rm your 
estimates of quantity and development schedule as accurately as possible.
2. Please inform  us  if  you  designate your own part number.
 Checklist Before lnquiry
Nov. 2005