Emerson 20002158 User Manual

Page of 36
2
Mounting
Topics covered in this chapter:
2.1
Recommendations for lifting heavy meters
Heavy meters (those over 50 lb. [22 kg]), and even lighter meters that must be installed in
elevated or difficult-to-reach places, usually require additional consideration when
transporting or lifting them into their installation location.
Safe handling during transportation and installation is the responsibility of the
installer – know and follow all safety practices and regulations for your facility and
for any lifting/rigging equipment being used
A professional rigging crew with proper equipment should be used
Typical equipment for handling heavy meters includes the following:
-
Fixed hoist boom trucks or cranes
-
Continuous web belt slings
-
Eye to eye web belt slings
-
Two leg wire rope slings
Lift a meter by its case or on the case side of its process fittings.
Do not lift a meter by its electronics (junction box, transmitter, or any electrical
fittings) or by its purge fittings
It may be useful to identify the meter center of gravity
Protect the sealed surfaces on the process fittings with factory-installed flange
protectors or comparable field-installed protection
Mounting
8
Micro Motion ELITE