Honeywell R4140G User Manual

Page of 28
R4140G FLAME SAFEGUARD PROGRAMMING CONTROLS
60-2337—3
6
OPERATION
Models with Preignition Interlocks
Fig. 3 shows all contacts in the standby position (zero
seconds). The opening and closing times are shown adjacent
Fig. 3. Simplified schematic diagram of R4140G1015 Programmer.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
B
R
W
B
R
W
14
12
11
10
9
L1 
(HOT)
L2
1
2
120V, 60 HZ
POWER SUPPLY
UNDERLINED O OR C DENOTES SNAP ACTION OF CONTACT.
A TIMER CONTACTS SNAP CLOSED.
B CONTACTS SNAP OPEN. 
MASTER
SWITCH
L2
O—OPENING TIME
C—CLOSING TIME
LS DENOTES LOCKOUT SWITCH; HTR DENOTES HEATER
INTERNAL
EXTERNAL
FLAME
DETECTOR
L1
PLUG-IN AMPLIFIER
FLAME SIGNAL
METER JACK
NUMBERS BELOW
DESIGNATE LINE
LOCATIONS OF
RELAY CONTACTS.
(UNDERLINE
INDICATES A 
NORMALLY CLOSED
CONTACT.)
LS - 19, 9
G
F
TIP JACK
17
4
8
13
3
9
13
5
8
12
10
16
11
7
17
2K
1K
M11B
C-15  O-70
2K3
1K3
2K2
M9A
C-57.5  O-109.5
TO
TERMINAL
    8
16
3
5
6
7
LIMITS
BURNER
CONTROLLER
PREIGNITION
INTERLOCKS
10 SECOND
INTERRUPTED
PILOT/IGNITION
30 SECOND
INTERRUPTED
PILOT/IGNITION
RUNNING
INTERLOCKS
(INCLUDING
 AIRFLOW SWITCH)
MAIN FUEL
VALVES (S)
BURNER  MOTOR
(BLOWER)
120 V ALARM
HIGH FIRE
LOW FIRE
COMMON
MODULATE
M8B  O-100   C-116
M8A  C-100  O-112
M10B  O-4  C-45
M10A  C-4  O-41
2K - 13, 9, 8
1K - 14, 14, 11
M7A
C-57.5  O-111
M7B
O-9.5  C-116
LS HTR
LS2
M2B
O-70
C-113.5
2K1
M4A
C-60
O-85
M2A
C-70
O-109.5
M6B
C-50  O-80
1K1
1K2
M1B
C-4
O-120
M3A
O-52   C-66
LOW FIRE
SWITCH
NORM
TEST
TIMER SWITCH
M5B
O-104
C-108
TIMER MOTOR
FIRING
RATE 
MOTOR
SERIES 90
CONTROLLER
PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION
AS REQUIRED.
TERMINAL 17 IS USED ONLY TO DRIVE THE SHUTTER ON A C7012E OR F
OR A C7076A ULTRAVIOLET FLAME DETECTOR WITH SELF-CHECKING
FEATURE. POWER TO DRIVE THE SHUTTER IS APPLIED TO TERMINAL 17
FROM TERMINAL 8 THROUGH A SOLID STATE SWITCH IN THE R7247C
OR R7476A DYNAMIC SELF-CHECK AMPLIFIER. REFER TO SAMPLE BLOCK 
DIAGRAM OF FIELD WIRING.
10 SECOND MAIN BURNER FLAME-ESTABLISHING PERIOD.
30 SECOND MAIN BURNER FLAME-ESTABLISHING PERIOD.
FOR DIRECT SPARK IGNITION (GAS OR OIL,) A JUMPER IS INSTALLED
BETWEEN TERMINALS 6 AND 7. REFER TO SAMPLE BLOCK DIAGRAM 
OF FIELD WIRING FOR HOOKUP.
USE A SERIES 90 MODULATING MOTOR IF MODULATION IS REQUIRED.
M10149
LS1
6
4
5
1
2
3
4
5
6
3
R4140G1007/G1015 SCHEMATIC
(WITH/WITHOUT HEAVY DUTY COVER)
to each timer contact. Refer to Fig. 4 and the Step-by-Step
Operation section.