Fluke 5220A User Manual

Page of 138
Operating Instructions
Operation
2
2-9
ajs04f.wmf
Figure 2-3. Typical Transconductance Error for Inductive Loads
2-20. Operation
The following procedure is suggested for operating the 5220A. With reference to the
previous paragraphs proceed as follows:
1.
 
Connect the 5220A to the 5100 Series Calibrator via the Y5000 Interface if remote
operation is desired. See the 5100B/Y5000 Instruction Manuals for details.
2.
 
Connect the 5220A to line power.
3.
 
Turn-on the 5220A by depressing the POWER switch to the ON position. Only the
STDBY and FRONT indicators should be lit.
4.
 
Energize peripheral equipment as required.
5.
 
If local operation is required, connect the control voltage source to the front-panel
VOLTAGE INPUT terminals.
6.
 
Adjust the output of the control voltage source (remote or local) to approximately
1 V.