Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1208
PGATE-BD (Packet Gateway Circuit Pack) 
9
Link Status Test (#601)
This test determines the state of the call control signaling link for X.25 Packet 
Gateways.
This test determines if the signaling link is connected or disconnected. If the link 
is connected, this test causes a test frame (called an XID frame) to be sent to the 
Packet Gateway circuit pack over the signaling link. The test passes if the 
signaling is connected and a test frame response is received by the switch. The 
test fails if the signaling link is disconnected or no response if received from the 
circuit pack.
This test is non-destructive.
PASS
Hardware setting and attached cable type match Packet Gateway circuit pack 
administration.
Table 9-484.
TEST #601 Link Status Test 
Error 
Code
Test 
Result
Description/ Recommendation
2012
ABORT
Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2100
ABORT
The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2
FAIL
The X.25 call control signaling link is disconnected.
1. Reexecute the test 5 times at 1-minute intervals.
2. If the test continues to fail, execute the ‘‘Packet Interface Test’’ to 
determine if the problem is due to the circuit pack. If the test fails, see 
repair procedures for Packet Interface Test.
3. If the Packet Interface Test passes, then see repair procedures for Packet 
Control circuit pack and Packet Bus.
Table 9-483.
TEST #600 Congestion Query Test  — Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page