DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1559
SW-CTL (Switch Control) 
9
Switch Control-Channel Transmission Test (#94)
Control channel messages are sent from the SPE to selected port circuit packs 
and the response from the port circuit packs is checked. This tests the ability of 
the Switch Control to send and receive messages on the control channel of the 
TDM bus.
For the case when the system is equipped with the High Reliability or Critical 
Reliability configuration, this test cannot run on the Switch Control in a standby 
SPE. However, this test may have run and failed while the Switch Control was on 
the active SPE which will alarm the Switch Control and cause an SPE 
FAIL
The Switch Control could not be successfully reset. If the system is equipped 
with the Standard Reliability configuration, you will probably not be able to 
make or receive calls involving telephones connected to the Processor Port 
Network. 
1. This failure could be due to either a MSSNET circuit pack hardware failure 
or the loss of system timing signals. If the Switch Control is alarmed, then a 
MSSNET circuit pack failure should be suspected. If the Switch Control is 
not alarmed, then investigate the possibility of the loss of system timing 
signals. See “TDM-CLK”. A TDM Bus Clock problem may cause many port 
circuit pack red LEDs to light. If only the MSSNET circuit pack LED is lit, 
suspect the MSSNET circuit pack. If many port circuit pack red LEDs are 
lit, suspect a TDM Bus Clock problem. Test #92 and Test #94 run as part of 
the test sequence for the test switch-control C command (where C 
represents the carrier location of the circuit under test). Both tests will fail if 
the system timing signals are lost. If test #94 passes, then do not suspect 
the loss of timing signals. If the MSSNET circuit pack is determined to be at 
fault, proceed to step 2. 
2. If the system is still able to process calls, replace the MSSNET circuit pack 
during a time that would cause the least service disruption. If the system is 
equipped with the High Reliability or Critical Reliability Configuration this 
can be done immediately since a MSSNET circuit pack on the standby 
SPE can be replaced without affecting service. The procedure for 
replacing the MSSNET circuit pack is described in ‘‘Replacing SPE Circuit 
Packs’’ 
in Chapter 5.
3. If calls cannot be made, then replace the MSSNET circuit pack 
immediately. The procedure for replacing the MSSNET circuit pack is 
described in ‘‘Replacing SPE Circuit Packs’’ in Chapter 5.
PASS
The Switch Control has initialized correctly. Look at results of the other tests to 
see if it is operating correctly.
Table 9-592.
TEST #93 Switch Control Reset Test  — Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page