Trane BCVC User Manual

Page of 92
46
 BCXC-SVX01B-EN
Pre-Start
Pre-Start Checklist
Complete this checklist after installing the unit to verify all recommended installation procedures 
are complete before unit startup. This does not replace the detailed instructions in the appropriate 
sections of this manual. Disconnect electrical power before performing this checklist. Always read 
the entire section carefully to become familiar with the procedures.
 WARNING
Hazardous Voltage!
Disconnect all electric power, including remote disconnects before servicing. Follow proper 
lockout/tagout procedures to ensure the power can not be inadvertently energized. Failure to 
disconnect power before servicing could result in death or serious injury.
Receiving
… Inspect unit and components for shipping damage. File damage claims immediately with the 
delivering carrier.
… Check unit for missing material. Look for ship-with drives, isolators, filters, and sensors that are 
packaged separately and placed inside the main control panel, fan section, or compressor section 
(see 
).
… Check nameplate unit data so that it matches the sales order requirements.
Unit Location
… Remove crating from the unit. Do not remove the shipping skid until the unit is set in its final 
position.
… Ensure the unit location is adequate for unit dimensions, ductwork, piping, and electrical 
connections.
… Ensure access and maintenance clearances around the unit are adequate. Allow space at the end 
of the unit for shaft removal and servicing (see 
Unit Mounting
… Place unit in its final location.
… Remove shipping skid bolts and skid.
… If using isolators, properly mount unit according to the isolator placement sheet.