Pre-Installation
Installation Preparation
Before installing the unit, perform the following procedures to ensure proper unit operation.
1.
Verify the floor or foundation is level. Shim or repair as necessary. To ensure proper unit 
operation, install the unit level (zero tolerance) in both horizontal axes. Failure to level the unit 
properly can result in condensate management problems, such as standing water inside the 
unit. Standing water and wet surfaces inside units can result in microbial growth (mold) in the 
drain pan that may cause unpleasant odors and serious health-related indoor air quality 
problem.
2. Allow adequate service and code clearances as recommended in the “Service Access” section 
(below). Position the unit and skid assembly in its final location. Test lift the unit to determine 
exact unit balance and stability before hoisting it to the installation location.
Service Access
See 
, below, and 
 for recommended service and code clearances.
 WARNING
Hazardous Voltage!
Disconnect all electric power, including remote disconnects before servicing. Follow proper 
lockout/tagout procedures to ensure the power can not be inadvertently  energized. Failure to 
disconnect power before servicing could result in death or serious injury.  
Table 1.
Service requirements, in. (cm)
Unit size
Dimension A
12
20 (50.8)
18
25 (63.5)
24
25 (63.5)
36
37 (94.0)
54
37 (94.0)
72
45 (114.3)
90
45 (114.3)