Toro 91764SL User Manual

Page of 140
Wiring Schematics and Diagrams
Logic Chart 
Each line on the Logic Chart shows the combination of 
switch conditions that must be made for the listed action 
to occur. Example - START, under ACTIONS: For the 
engine to start the Key Switch must be moved to Start 
(making terminals B + I + S) and the hydraulic pump 
must be in Neutral (neutral switch CLOSED). 
KEY 
⊗ 
levent 
Switch Closed
Switch Open 
Switch Closed Momentarily 
Switch Conditon Not Re
SWITCHES
St
a
rt
 -
 Ke
Swit
ch 
+ I 
+ S 
R
un 
-
Ke
y S
w
it
ch 
B + I
 + A
 /
 X 
+ Y 
Neutral Switch (HJ30
00 o
n
ly) 
Oil Pre
ssu
re Swit
ch 
W
a
te
r Pre
ssu
re Swit
ch 
Pum
p St
art Limit Switch 
Lift Li
mit S
w
it
c
T
ran
sport Swi
tc
h
 (HJ30
00 o
nly) 
Aerato
r Start (Enga
ge) Swi
tc
Aerato
r Stop 
(Di
s
e
nga
ge) Swi
tch 
Lift Switch UP
 (HJ30
00 
only) 
Lift Switch DOW
N
 (HJ3000 only) 
Brake Switch
Accum
ulator Charge
 Switch 
ACTIONS 
1. Start 
2. Run 
3. Machine Lower (aerate position) 
4. Aerate 
(see Controller Timing below) 
Machine Moving (out of neutral) 
⊗ 
Machine Stationary (neutral) 
5. Machine Raise (transport position) 
Controller Timing 
Aerate START-UP Sequence 
1. Pump clutch engages immediately. 
2. Valve clutch engages 5 seconds after pump clutch engages. 
Aerate SHUT-DOWN Sequence (Neutral Delay) 
1. Pump clutch disengages and green light goes off 4 seconds after transport switch opens (red light goes off). 
2. After another 3 seconds, valve clutch will disengage.
NOTE: Keeping aerate start (engage) switch pushed in (closed) will keep green light on and override neutral delay
shut-down.
Aerate SHUT-DOWN Sequence (Disengage Delay) 
1. Pump clutch disengages and green light goes off immediately when stop (disengage) switch is pushed in (opens) 
or if pump start limit switch or water pressure switch opens (yellow light goes off). 
2. After another 3 seconds, valve clutch will disengage. 
Wiring Schematics and Diagrams 
Page 5 - 2  Rev. B 
HydroJect 3000