Dynasty Spas 2008 User Manual

Page of 28
Dynasty Spas Operator’s Guide • www.dynastyspas.com
8
Getting Ready For Delivery & Set-up Of Your New Spa
Surface And Pad Requirements
Your new portable spa must be placed on a uniformly firm, flat, and level
surface. A concrete pad 3 inches thick is best.
If your spa is located near sprinklers, adjust or cap them so they do not
hit the siding of the spa.
Balconies And Deck Requirements
Decking must be constructed to support 85 pounds per square foot.
Balconies must be constructed to meet current state and local codes.
Gates must be self-closing and self-latching.
Access & Clearance
Your spa requires from 37” (non stereo) to 42” (stereo) of clearance
through gates between house and side fences, and up to 8.5' overhead
clearance depending on the size of the unit.
The clearance required to turn a corner can be equal to the length of the
spa.
All debris blocking access to the job site must be removed prior to
delivery. Any trimming of trees or bushes, removal of debris, leveling of
ground or other general maintenance must be done prior to delivery and
is the responsibility of the customer.
SET-UP & DELIVERY GUIDELINES
CAUTION!
Decking must be constructed to support 85 pounds per square foot.