15.0  120/240 VAC Convertible Circuit Diagram
This wiring diagram is used for all US/Canada convertible power
Caprio, Metro, and Solo Models with 120/240 VAC (60 Hz) power
requirements.
Ozonator
O
3
GRN
TB1
Standard 120 V
AC 3-W
ire Connection 
(60 Hz, 1 Phase, 15 
A
 Service)
Use copper conductors ONL
Y
.  Wire size must be 
appropriate per NEC and/or local codes.
WHT
WHT
WHT
WHT
WHT
BLK
BLK
RED
BLK
BLK
BLK
BLK
BLK
RED
RED
RED
BLK
3
2
1
Heater
1.0 kW @ 120 V
A
C
4.0 kW @ 240 V
A
C
Flow Switch
Hi-limit/Freeze 
Sensor
T
emperature Sensor
J2
J3
F1
20A
250V
SC-20
Circ.
Pump
Main
Pump
Spa Light
T
ransformer
120 V
A
C
J4
BLK
RED
*
GRN
TB1
WHT
BLK
RED
3
2
1
Optional 120/240 V
AC 
4-W
ire Convertible 
Heater Connection
1.  Remove and discard the 
factory installed GFCI Cord.
2.
Move RED
*
 wire from TB1 
position #1 to TB1 position #3
as shown below
.
3.  Permanently connect to 
the power supply
.  
Use 
copper conductors ONL
Y
.  
W
ire size must be 
appropriate per NEC and/or 
local codes.
4.  If hot tub is to be operated
on 30A
 service, make sure
the jumper provided at 
location JP1 #1&2 on the 
circuit board is installed.  If 
hot tub is to be operated on 
40A
 service, remove the 
jumper JP1 #1&2 on the 
circuit board.
HI
LO
JP1
4
2
3
1
65
87
Logic Jumper Settings (Factory Defaults Shown)
JP1 1-2 ON    =  15A
 Logic (3-wire 120 V
AC operation only)
JP1 1-2 ON    =  30A
 Logic (4-wire 120/240 V
AC operation only)
JP1 1-2 OFF  =  40A
 Logic (4-wire 120/240 V
AC operation only)
JP1 7-8 ON    = 
°C T
emperature 
Display
JP1 7-8 OFF  = 
°F T
emperature 
Display
J20
J21
J12
J14
J16
J1
1
J15
J13
J17
J7
J8
J9
J10
J5
J6
Heater IN
Heater OUT
F1*
K1
K2
K3
K4
K5
K7
K8
J1
Control 
Panel