Tektronix 070-9197-00 User Manual

Page of 72
Getting Started
4
PS2520G and PS2521G Programmer Manual
3. To check the address setting of the power supply, press the
LOCAL button again. The display remains active for about
3 seconds to allow you to view or change the setting.
Testing the GPIB Connection
To test whether the GPIB connection is working, send a GPIB query
from the computer. For example, the query
should return the name of the instrument, SCPI version, and
firmware version in the following form:
If you do not get a proper response from the programmable power
supply, check to make sure the power is on, all cable connections are
secure, and the GPIB address is correct.