APC RBC 118 Leaflet
Customer support and warranty information is available at the APC Web site, www.apc.com.
© 2010 APC by Schneider Electric. All trademarks are owned by Schneider Electric Industries
S.A.S., American Power Conversion Corporation, or their affiliated companies.
S.A.S., American Power Conversion Corporation, or their affiliated companies.
990-3708
01/2010
XLBP Replacement Batteries—APCRBC118
Remove the XLBP Batteries
Install the XLBP Replacement Batteries
Reset the Battery Install Date
Reset the Battery Install Date for the internal UPS battery.
If the Battery Install Date screen does not appear on the display interface
within two minutes of installing the new battery, use the arrow keys to
navigate to: Main Menu > Configuration > Battery Install Date.
within two minutes of installing the new battery, use the arrow keys to
navigate to: Main Menu > Configuration > Battery Install Date.
On the Battery Install Date screen, use the arrow keys to select the month,
date, and year. Press
date, and year. Press
E
NTER
to make a selection and move to the next
option.
When finished, press
E
NTER
to save the date.
When the RBC is fully charged, perform a self-test and run time calibration test.
su
0
5
7
4
a
s
u
0584a
s
u05
73
a
su
0
5
9
7
a
s
u
05
96a
s
u
03
43
b