Grizzly G0795 User Manual

Page of 64
Model G0795 (Mfd. Since 02/15)
-19-
Spindle Bearing 
Break-In
Inspections & 
Adjustments
The following adjustments were performed at the 
factory before the machine was shipped:
• 
Gib Adjustments .............................
Page 40
• 
Leadscrew Backlash ......................
Page 40
• 
Return Spring Tension .....................
Page 41  
Please  be  aware  that  these  adjustments  can 
change during the shipping process. Pay careful 
attention to these adjustments when first operat-
ing the machine. If you find that adjustments are 
not  set  to  your  personal  preference,  re-adjust 
them.
1.  Set mode switch to Drill.
2.  Set spindle speed to 115 RPM (see Spindle 
Speed  on  Page  26  for  details).  Run  for  10 
minutes  in  each  direction  of  rotation  (FWD 
and REV).
To perform spindle break-in procedure:
The  spindle  break-in  procedure  distributes  lubri-
cation throughout the bearings to reduce the risk 
of early bearing failure if there are any "dry" spots  
or areas where lubrication has settled in the bear-
ings.  You 
must  complete  this  procedure  before 
placing  operational  loads  on  the  spindle  for  the 
first  time  when  the  machine  is  new  or  if  it  has 
been sitting idle for longer than 6 months.
Always  start  the  spindle  break-in  at  the  lowest 
speed  to  minimize  wear  if  there  are  dry  spots. 
Allow the spindle to run long enough to warm up 
and distribute the bearing grease, then incremen-
tally increase spindle speeds and repeat this pro-
cess at each speed until reaching the maximum 
spindle  speed.  Following  the  break-in  procedure 
in  this  progressive  manner  helps  minimize  any 
potential wear that could occur before lubrication 
is fully distributed.
You must complete this procedure to main-
tain the warranty. Failure to do this could 
cause rapid wear-and-tear of spindle bear-
ings once they are placed under load.
After  completing  the  spindle  break-in  procedure, 
we  recommend  changing  the  headstock  oil  to 
flush  any  small  particles  that  may  be  present  in 
the  headstock  from  the  manufacturing  process. 
Refer to the 
Lubrication section on Page 34 for 
detailed instructions.
3.  Stop  spindle.  Select  the  next  highest  speed 
and run spindle for a minimum of 5 minutes 
in each direction of rotation.
4.  Repeat  Step 3  for  each  remaining  speed, 
working from lowest to highest. The 
Spindle 
Bearing Break-In is now complete!