Yamaha 3-axis model User Manual
![Yamaha](https://files.manualsbrain.com/attachments/884c61a284ec9743365c8176528d257dbb7df7e8/common/fit/150/50/873735ee4330929e1549bc72378da029dfa61bac72d66c1f7587e7b724ba/brand_logo.png)
11-18
Chapter 11 FXYBX/SXYBX
10) When completed with all wiring work, return each wiring box cover to the
original positions. Sandwich the X-axis wiring and air tube with the protec-
tive material at the wire lead-out port of each wiring box.
tive material at the wire lead-out port of each wiring box.
!
CAUTION
Take care not to catch the wiring or air couplers when installing the covers.
Remove the upper cover
of the Y-axis wiring box
of the Y-axis wiring box
Set the harness and air tube
from the grommets on the
X-axis wiring box
from the grommets on the
X-axis wiring box
X-axis wiring box end face resin cover
When leading out the wires
from the Y-axis wiring box,
use the grommets on the upper cover
from the Y-axis wiring box,
use the grommets on the upper cover
Carry out wiring and piping
Remove the four M4 screws
Carry out wiring and piping
r
t
q
e
w
Fig. 11-18